EDCEzzat Digital ConstructionThe Execution Problem Solver
English
🎨 Platform look
Sign InSign Up
← Back6 · Asset Management and Operation📘 ISO 19650-3

The Operational Phase of Assets

Part 3 of the standard covers the operational phase: the asset information model stays up to date with every maintenance job or change, and each trigger event updates its data.

  • Asset information model AIM
  • Trigger events update the data
  • Maintenance from the same data
The Operational Phase of Assets
  1. 0:00 The Operational Phase of Assets
  2. 0:05 Asset information model AIM
  3. 0:10 Trigger events update the data
  4. 0:15 Maintenance from the same data
English
🎨 Platform look