EDCEzzat Digital ConstructionThe Execution Problem Solver
English
🎨 Platform look
Sign inSign up
4 · Construction on site

Concrete pours and cubes

Each pour recorded with its place and volume; cube results arrive by themselves.

  • Volume and place on the model
  • 7- and 28-day cubes
  • A pour waits while an opening is open
Every kind of report, and what it tells you
  1. 0:00 The daily report in two minutes
  2. 0:07 Weekly and monthly by themselves
  3. 0:14 A stamped, signed PDF
  4. 0:21 It reaches everyone who needs it
English
🎨 Platform look