← Back2 · Design and Model📘 ISO 19650-2 · 5.4–5.6
Mobilisation and Collaborative Production
After the appointment the team confirms the execution plan and the information delivery plans (MIDP / TIDP), sets up and tests its tools, then produces the models together and checks them before sharing.
- 🗓️Information delivery plan MIDP / TIDP
- ⚙️Mobilisation: tools set up and tested
- 🧩Federated models checked before sharing
- 0:00 Mobilisation and Collaborative Production
- 0:05 Information delivery plan MIDP / TIDP
- 0:10 Mobilisation: tools set up and tested
- 0:15 Federated models checked before sharing