Steps in the video
  1. 1Boreholes on the map
  2. 2The soil under each footing
  3. 3An excavation photo from site
  4. 4Pile tests
A day with EDC
  1. 08:00

    Puts new boreholes on the site map

  2. 11:00

    Answers an excavation photo with a different layer

  3. 14:00

    Reviews a pile load test result

  4. 16:00

    Updates the soil report on the foundations

Who they work with on EDC
Who they are and what they do

The geotechnical engineer drills boreholes, reads the soil layers and the groundwater level, and sets the soil's bearing capacity and the right foundation: raft, footings or piles.

A soil mistake shows years later as settlement or cracks, and fixing it costs more than anything. During excavation, site comes back to them if the layers differ from the report.

How EDC helps them

In EDC boreholes show on the site map where they were drilled, and the soil report is tied to the foundations on the model. Anyone who taps a footing sees the soil beneath it.

The site engineer photographs the excavation and sends it if the soil looks different, and they answer with a decision in steps. Pile and compaction tests are logged on each element.

What you can do
  • Put boreholes on the site map
  • Tie the soil report to the foundations
  • Answer site when the soil differs
What you gain
  • Less settlement and fewer cracks
  • Quick decisions during excavation
  • Soil data kept with the building