Sustainability engineer
Energy, water and green ratings such as Estidama and LEED.
- 1🧊The material and its green data
- 2📊Points secured and missing
- 3📸Waste-sorting photos
- 4📄The submission file
- 09:00
Checks the points secured and missing
- 11:00
Stops a purchase of paint that fails the rating
- 14:00
Reviews waste-sorting photos from site
- 16:00
Prepares the energy part of the submission
The sustainability engineer cuts the building's energy and water use and picks materials that harm the environment less. They prepare the green rating file, such as Estidama in Abu Dhabi or LEED.
In the UAE and Saudi Arabia a green rating is now a permit condition on many projects. Points are gathered from thousands of documents, and if one is lost the point is lost.
In EDC every material on the model carries its environmental data and certificate, and every credit is tied to the documents that prove it. So they see how many points are secured and how many are missing.
Procurement is warned before buying a material that would lose a point, and site uploads photos of waste sorting. The submission file comes out ordered to the rating body's requirements.
- ✓Track the green rating points
- ✓Tie each point to the document that proves it
- ✓Warn procurement before a wrong material
- ★The rating without surprises
- ★A building that uses less power and water
- ★A ready submission file